User ID
Password

 

 

Ship pays $4 million to skip line to cross Panama Canal
Source
American Shipper
Post Date
08/31/2026

While typical transits through the waterway are paid by a flat rate via reservations, the Panama Canal Authority also offers customers an auction process in order to bypass the regular queue.

The $4 million paid by the Seaspan Benefactor to jump to the front of the line on Monday was more than double the average of the previous seven days.

A container ship paid $4 million to cut the line at the Panama Canal, where wait times are stretching more than a week, as vessels seek native routes because of the Iran war.

The near-record high auction figure was paid by the owner of the vessel, the Seaspan Benefactor, according to people familiar with the matter who could not be identified because the auction data is private.

Shipowners are shelling out millions of dollars to use the auction workaround as the Iran war forces more congestion at the Panama Canal, which links the Atlantic Ocean with the Pacific. Buyers and sellers of oil, natural gas, fertilizer and chemicals, especially those in Asia, have scrambled to find native routes with traffic deeply curtailed at two key Persian Gulf transit points ?the Strait of Hormuz and more recently the Bab el-Mandeb.

Neopanamax-size vessels, such as those carrying liquefied petroleum gas, liquefied natural gas, crude oil and refined products, without booked transit slots have to wait 10 days in line, the highest since May for Pacific-to-Atlantic transit, according to data from Argus Media.

The ship was last shown in South Korea before heading to the Panama Canal. As of Tuesday, it was seen positioned on the Pacific side of the canal and looked to be waiting to transit northbound, according to shipping data compiled by Bloomberg.

The Panama Canal Authority said in a statement that auctions have experienced an increase in market costs due to shifts in global trade supply and demand and acknowledged that some have exceeded $1 million.

Adding to the bottleneck are maintenance outages at the locks. Work that is expected to last until September is also affecting locks that handle Neopanamax-size vessels. The canal also recently reduced the maximum allowed draft in the Neopamax locks over the coming weeks amid lower-than-expected rainfall due to the El Ni? phenomenon.


Title
Source
Post Date
Visit
White House Targets Transshipment as Customs Crackdow.. American Shipper 08/31/2026
10
MSC deploys megamax ships (again) on Transpacific .. American Shipper 08/31/2026
10
Ship pays $4 million to skip line to cross Panama Can.. American Shipper 08/31/2026
10
US Eyes China Overcapacity Tariffs of 7.5% Before Xi-.. American Shipper 08/26/2026
99
White House claims over 40 US trading partners are he.. American Shipper 08/19/2026
126
Trade court upholds Trump? closure of ?e minimis?loop.. American Shipper 08/19/2026
106
Some high-earning investors will soon owe taxes on ye.. American Shipper 08/07/2026
167
Ocean Transportation Intermediary Licenses Revoked.. American Shipper 08/07/2026
169
Trump announces ?reedom Haulers?initiative.. American Shipper 08/07/2026
153
United States imposes safeguard tariff-rate quota on .. American Shipper 08/07/2026
140
Page : 1   2   3   4   5        [Next 5 Page]  Last Page : 97 ( 1 of 97  Total Pages )

 

 

 

Brilliant Group Logistics INC.
159 N. Central Ave. Valley stream, NY 11580
Tel : (516) 599-2406 Fax : (516) 599-0528