User ID
Password

 

 

Google
Source
American Shipper
Post Date
09/10/2021

Google’s Upcoming St. John’s Terminal Office Progresses Further With Exterior Work, In Hudson Square More exterior progress on Google’s 1.3 million-square-foot office at 550 Washington Street has been made in Hudson Square. Designed by COOKFOX Architects and developed by Oxford Properties, the topped-out building is the central component of the “Googleplex” that will encompass a total of 1.7 million square feet across three separate structures with the other two sites being 315 Hudson Street and 345 Hudson Street. Turner Construction is responsible for constructing the 12-story steel-framed edifice that spans two full city blocks between West Street, West Houston Street, Washington Street, and the New York Department of Sanitation building.
Since our last back in early March, the top floors of the structure have been enclosed in floor-to-ceiling glass and metal panels that wrap around all four sides of the massive rectangular office complex. Also seen are the industrial-style windows that line the podium of the western elevation.
The glass frontage for the whole ground floor is one of the last major external components currently being worked on, which largely sit behind fencing and wooden boards up against the sidewalks. Looking from above at the eastern side gives us an idea of how the first level is shaping up.
The northern profile of 550 Washington Street is steadily taking shape, particularly the lower half that will feature a hollow steel-framed canopy made of multiple girders at the top of the terminal’s original roof line. Abundant landscaping on almost every level and around the main entrance, the top of the canopy, and sidewalks will also populate this side of the superstructure. This is best depicted in the rering below.
Future occupants will have access to a number of outdoor landscaped terraces, large expansive rooftop areas that overlook the Hudson River and the Lower Manhattan and Midtown skylines, and amenities that have yet to be announced.
YIMBY last reported that 550 Washington Street is expected to be completed sometime next year.


Title
Source
Post Date
Visit
MSC shifts two trans-Atlantic vessels to new trans-Pa.. American Shipper 09/22/2021
6
Ports of Los Angeles and Long Beach expand hours to s.. American Shipper 09/22/2021
6
Remote work didnt wipe out big cities — it made them .. American Shipper 09/22/2021
7
People assume trust-fund babies are spoiled 20-someth.. American Shipper 09/15/2021
33
ILA says won’t work automated vessels at US ports.. American Shipper 09/15/2021
32
US chassis supply to be stressed into 2022.. American Shipper 09/15/2021
46
Unprecedented import volumes to continue well into 20.. American Shipper 09/15/2021
44
Google.. American Shipper 09/10/2021
64
Delivery of new container vessels exts into 2025.. American Shipper 09/10/2021
41
Carriers becoming cautious of gung-ho long-term box s.. American Shipper 09/10/2021
68
Page : 1   2   3   4   5        [Next 5 Page]  Last Page : 56 ( 1 of 56  Total Pages )

 

 

 

Brilliant Group Logistics INC.
159 N. Central Ave. Valley stream, NY 11580
Tel : (516) 599-2406 Fax : (516) 599-0528